Installation
HYBRID / BATTERY CONTROL: BATTERY SMART UNIT: INSTALLATION
1. INSTALL BATTERY SMART UNIT
CAUTION:
Be sure to wear insulated gloves and protective goggles.
(a) Install the battery smart unit with the 2 bolts.
Torque : 7.5 Nm (76 kgf-cm, 66 in-lbf)
(b) Connect the 3 connectors.
NOTICE:
The connectors should be connected securely.
2. INSTALL HYBRID BATTERY JUNCTION BLOCK ASSEMBLY
Installation