Canister Purge Control Valve: Testing and Inspection
2GR-FSE EMISSION CONTROL: PURGE VALVE: INSPECTION
1. INSPECT NO. 1 VACUUM SWITCHING VALVE ASSEMBLY
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
(b) If the result is not as specified, replace the No. 1 vacuum switching valve assembly.
(c) Check operation of the purge VSV.
(1) Check that air does not flow from port E to port F.
Text in Illustration
(2) Apply battery voltage across terminals 1 and 2.
(3) Check that air flows from port E to port F.
Text in Illustration
(3) If the result is not as specified, replace the No. 1 vacuum switching valve assembly.