Installation
3UZ-FE COOLING: FAN: INSTALLATION
INSTALLATION
1. INSTALL COOLING FAN MOTOR
(a) Install the fan motor with the 3 screws.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
2. INSTALL NO. 2 COOLING FAN MOTOR
(a) Install the fan motor with the 3 screws.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
(b) Connect the 2 wires to the fan shroud.
3. INSTALL FAN
(a) Install the 2 fans with the 2 nuts.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
4. INSTALL COOLING FAN ECU
(a) Install the ECU with the 2 screws.
(b) Connect the 2 connectors.
5. INSTALL FAN SHROUD SUB-ASSEMBLY
(a) Install the fan shroud with the 6 bolts.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
(b) Connect the 3 clamps and wire harness to the fan shroud.
(c) Connect the 2 connectors.
6. INSTALL ENGINE ROOM ECU OUTLET DUCT
(a) Install the outlet duct.
7. CONNECT NO. 1 RADIATOR HOSE Installation
8. INSTALL AIR CLEANER ASSEMBLY Installation
9. INSTALL INTAKE AIR CONNECTOR PIPE Installation
10. INSTALL RADIATOR RESERVE TANK ASSEMBLY
(a) Install the reserve tank with the 2 bolts.
(b) Squeeze the clip and install the reserve tank inlet hose to the radiator assembly.
11. INSTALL NO. 1 AIR CLEANER INLET Installation
12. ADD ENGINE COOLANT Service and Repair
13. CHECK FOR ENGINE COOLANT LEAKS Testing and Inspection
14. INSTALL ENGINE UNDER COVER
15. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
16. PERFORM INITIALIZATION
(a) Perform initialization Repair Instruction - Initialization.
NOTE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.