FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation








1UR-FSE ENGINE MECHANICAL: DRIVE BELT: INSTALLATION

INSTALLATION

1. INSTALL V-RIBBED BELT





(a) Install the V-ribbed belt as shown in the illustration.
NOTE:
Check that the V-ribbed belt is properly set to each pulley.
(1) Rotate the tensioner pulley counterclockwise, and then remove the fix bar.
2. INSTALL INTAKE AIR CONNECTOR PIPE Installation
3. INSTALL NO. 1 AIR CLEANER INLET Installation
4. INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY Installation
5. INSTALL V-BANK COVER SUB-ASSEMBLY Installation