Installation
4GR-FSE ENGINE MECHANICAL: ENGINE FRONT OIL SEAL: INSTALLATION
INSTALLATION
1. INSTALL TIMING CHAIN CASE OIL SEAL
(a) Apply MP grease to the lip of a new oil seal.
NOTE:
Keep the lip free of foreign matter.
(b) Using SST and a hammer, tap in the oil seal until its surface is flush with the timing chain cover edge.
SST: 09223-22010
SST: 09506-35010
- Keep the lip free of foreign matter.
- Do not tap the oil seal at an angle.
2. INSTALL CRANKSHAFT PULLEY
(a) Install the pulley set key to the key groove.
(b) Align the pulley set key with the key groove of the pulley, and slide on the pulley.
(c) Using SST, install the crankshaft pulley bolt.
SST: 09213-70011
09213-70020
SST: 09330-00021
Torque: 250 Nm (2,550 kgf-cm, 184 ft-lbf)
3. INSTALL V-RIBBED BELT Installation
4. INSTALL RADIATOR ASSEMBLY
HINT:
Installation.
5. INSPECT FOR OIL LEAK