FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation








1UR-FSE INTAKE: INTAKE MANIFOLD: INSTALLATION

INSTALLATION

1. INSTALL INTAKE MANIFOLD
(a) Install 2 new gaskets to the intake manifold.






(b) Temporarily install the intake manifold with the 2 nuts and 8 bolts. Then tighten the 2 nuts and 8 bolts uniformly in the order shown in the illustration.
Torque: 21 Nm (214 kgf-cm, 15 ft-lbf)






(c) Connect the PCV hose to the intake manifold.
NOTE: Face the claws of the clips as shown in the illustration.





2. INSTALL PURGE VSV
(a) Install the purge VSV with the bolt.
Torque: 21 Nm (214 kgf-cm, 15 ft-lbf)
(b) Connect the fuel vapor feed hose to the intake manifold.
(c) Connect the No. 2 fuel vapor feed hose to the purge VSV.
3. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY






(a) Install the water by-pass pipe to the intake manifold with the 2 bolts.
(b) Connect the heater water inlet hose, heater water outlet hose, water inlet hose, and No. 3 water by-pass hose to the water by-pass pipe with the 4 clamps.
NOTE: Face the No. 3 water by-pass hose clip as shown in the illustration.





4. INSTALL INJECTOR DRIVER
(a) Install the injector driver to the intake manifold by installing the 2 bolts and 2 nuts in the order shown in the illustration.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Connect the 4 wire harness connectors to the injector driver. Then move the lock lever as shown in the illustration to lock the connectors.
(c) Connect the 2 clamps to the injector driver.
5. CONNECT ENGINE WIRE
(a) Connect the engine wire harness connector.
HINT: To connect the injector driver connectors, move the lock lever to lock the connector.

(b) Connect the +B terminal of the generator assembly with the nut.
Torque: 12 Nm (122 kgf-cm, 9 ft-lbf)
(c) Connect the 6 engine wire harness clamps.
(d) Connect the engine wire to the fusible link block assembly with the nut.
Torque: 13 Nm (127 kgf-cm, 10 ft-lbf)
(e) Connect the engine wire harness ground side with the bolt.
Torque: 21 Nm (214 kgf-cm, 15 ft-lbf)
(f) Install the 3 engine wire harness clamp brackets with the 3 bolts.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
(g) Connect the engine wire harness with the 4 nuts.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)





6. INSTALL AIR CLEANER ASSEMBLY LH






(a) Install the air cleaner case with the 2 nuts and clip.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
(b) Install the air cleaner element to the air cleaner case.






(c) Install the air cleaner cap with the 2 clamps.
(d) Connect the MAF meter connector.
7. INSTALL AIR CLEANER ASSEMBLY RH






(a) Install the air cleaner case with the 2 nuts and clip.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
(b) Install the air cleaner element to the air cleaner case.






(c) Install the air cleaner cap with the 2 clamps.
(d) Connect the MAF meter connector.
8. INSTALL THROTTLE BODY Installation

9. INSTALL INTAKE AIR CONNECTOR PIPE Installation

10. INSTALL NO. 1 AIR CLEANER INLET Installation

11. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
12. ADD ENGINE COOLANT Service and Repair

13. INSPECT FOR ENGINE COOLANT LEAK Component Tests and General Diagnostics

14. INSTALL ENGINE ROOM SIDE COVER RH Installation

15. INSTALL AIR CLEANER INLET COVER Installation

16. INSTALL V-BANK COVER SUB-ASSEMBLY Installation

17. INSTALL NO. 2 ENGINE UNDER COVER Installation

18. INSTALL FRONT SUSPENSION MEMBER PROTECTOR LOWER Installation

19. INSTALL NO. 1 ENGINE UNDER COVER Service and Repair

20. INSTALL COWL TOP VENTILATOR LOUVER RH Installation

21. PERFORM INITIALIZATION
(a) Perform initialization Repair Instruction - Initialization.
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.