FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation









1UR-FSE ENGINE MECHANICAL: DRIVE BELT: INSTALLATION

1. INSTALL V-RIBBED BELT






(a) Install the V-ribbed belt as shown in the illustration.
NOTICE:
Check that the drive belt is properly set to each pulley.
(1) Rotate the V-ribbed belt tensioner pulley counterclockwise, and then remove the bar.
2. INSTALL RADIATOR RESERVE TANK ASSEMBLY
(a) Install the radiator reserve tank assembly with the 2 bolts.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
3. INSTALL NO. 1 AIR CLEANER INLET Installation

4. INSTALL COOL AIR INTAKE DUCT SEAL Installation