FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Inspection





UPPER LINK


Inspection


INSPECTION AFTER REMOVAL

Appearance
Check the following items, and replace the part if necessary.
- Upper link and bushing for deformation, cracks or damage.
- Ball joint boot for cracks or other damage, and also for grease leakage.

Ball Joint Inspection
Manually move ball stud to confirm it moves smoothly with no binding.

Swing Torque Inspection

NOTE:
Before measurement, move ball stud at least ten times by hand to check for smooth movement.
1. Move the ball joint at least ten times by hand to check for smooth movement.





2. Hook a spring balance (A) at cutout on ball stud. Confirm spring balance measurement value is within specifications when ball stud begins moving.

Swing torque : Specifications "Ball Joint"

- If swing torque exceeds standard range, replace upper link assembly.

Axial End Play Inspection
1. Move the ball joint at least ten times by hand to check for smooth movement.
2. Move tip of ball stud in axial direction to check for looseness.

Axial end play : Specifications "Ball Joint".

- If axial end play exceeds standard range, replace upper link assembly.

INSPECTION AFTER INSTALLATION
1. Check wheel sensor harness for proper connection. Exploded View VDC/TCS/ABS.
2. Check wheel alignment. Front Suspension.
3. Adjust neutral position of steering angle sensor. Description Special Repair Requirement Description Special Repair Requirement, "ADJUSTMENT OF STEERING ANGLE
SENSOR NEUTRAL POSITION : Special Repair Requirement".