Pinpoint Test D: All Door Locks Are Inoperative From One Switch
Locks, Latches and Entry Systems
Pinpoint Tests
Pinpoint Test D: All Door Locks Are Inoperative From One Switch
Refer to Wiring Diagram Set 110, Power Door Locks for schematic and connector information. Diagrams By Number
Normal Operation
The Smart Junction Box (SJB) sends voltage signals to the door lock control switches through circuits 1296 (OG/BK) and 1316 (WH/VT) for the lock requests, and through circuits 1297 (YE/RD) and 1317 (DB/LG) for the unlock requests. The door lock control switches receive ground through circuit 1205 (BK). When the lock or unlock switch is pressed, the voltage signal is routed to ground.
The SJB contains internal relays that are energized depending on input received. When the SJB receives a lock or unlock request from the door lock control switch, the SJB energizes the appropriate relay(s) to lock or unlock the doors.
This pinpoint test is intended to diagnose the following:
- Wiring, terminals or connectors
- Door lock control switch
PINPOINT TEST D: ALL DOOR LOCKS ARE INOPERATIVE FROM ONE SWITCH
NOTICE: Use the correct probe adapter(s) when making measurements. Failure to use the correct probe adapter(s) may damage the connector.
-------------------------------------------------
D1 CHECK THE DOOR LOCK CONTROL SWITCH
- Disconnect: Suspect Door Lock Control Switch.
- Carry out the driver or passenger door lock control switch component test.
- Is the door lock control switch OK?
Yes
REPAIR circuit 1205 (BK) for an open. TEST the system for normal operation.
No
INSTALL a new door lock control switch. REFER to Door Lock Control Switch Service and Repair. TEST the system for normal operation.
-------------------------------------------------