Test D: The Washer Pump Is Inoperative
PINPOINT TEST D: THE WASHER PUMP IS INOPERATIVED1-D5:
D5-D9:
D9-D11:
D12:
Normal Operation
The washer switch portion of the multi-function switch grounds circuit 680 (LB/OG) which signals the smart junction box (SJB) to energize the washer pump relay. The relay provides voltage to the windshield washer pump through circuit 941 (BK/WH). The washer pump is grounded through circuit 57 (BK).
Possible Causes
- Fuse(s)
- Circuit 57 (BK) open
- Circuit 680 (LB/OG) open or short to ground
- Circuit 941 (BK/WH) open
- Multi-function switch
- SJB
- Windshield washer pump