Integrated Control Unit (ICU) - Installation
INSTALLATION
1. Install unit (1), pushing mounting bracket down into mounting grommets (2) located in body side rail.
CAUTION: Before installing the ABM harness connector (2) on the ABM (1), be sure the seal is properly installed in the connector.
2. Insert ABM harness connector (2) into socket of ABM (1) and close cover, locking connector in place.
3. Install left (2) and right (1) rear brake tubes at hydraulic control unit (4). Tighten tube nuts to 20 Nm (177 in. lbs.) torque.
4. Install left (2) and right (3) brake tubes at hydraulic control unit (4). Tighten tube nuts to 20 Nm (177 in. lbs.) torque.
5. Install primary (4) and secondary (1) brake tubes at hydraulic control unit (7). Tighten tube nuts to 20 Nm (177 in. lbs.) torque.
6. Remove brake pedal holding tool.
7. Connect battery negative cable (2) to battery post. It is important that this is performed properly.
8. Fill and bleed (1) base brake hydraulic system and ABS Service and Repair.
9. Perform Diagnostic Verification Test and clear any faults Verification Tests.