Winch Relay Pack - Installation
INSTALLATION
NOTE: Relay #4 shown, all others similar.
1. Install the control wires (2) to all the relays and install the nuts (1).
2. Tighten the nuts to 3 Nm (25 in. lbs.).
3. Install the red battery positive cable (1) and install the switch wire.
4. Install the nut and tighten to 10 Nm (85 in. lbs.).
5. Install the relay pack cover (1) and install the three screws (2).
6. Install the winch assembly (2). Winch - Installation
7. Connect the battery negative cable (3) and verify winch operation.