Hybrid/EV Battery Pack Coolant Control Solenoid Valve Learn
Hybrid/EV Battery Pack Coolant Control Solenoid Valve Learn
Hybrid/EV Battery Pack Coolant Control Solenoid Valve Learn
The Hybrid/EV Battery Pack Coolant Control Solenoid Valve Learn procedure must be completed when the following components are replaced:
* Hybrid/EV Powertrain Control Module 2
* Hybrid/EV Battery Pack Coolant Control Solenoid Valve
The Hybrid/EV Battery Pack Coolant Control Solenoid Valve Learn procedure can be completed with a scan tool using the following steps:
1. Install the scan tool to the data link connector.
2. Vehicle in Service Mode, engine OFF.
3. Select Hybrid/EV Battery Pack Coolant Control Solenoid Valve Learn in the Hybrid/EV Powertrain Control Module 2 Control Functions list.
4. Follow the scan tool directions to complete the procedure.
5. Clear any DTCs that may be set.