26 11 000 Removing and Installing Propeller Shaft (Inserted) Completely
26 11 000 Removing And Installing Propeller Shaft (Inserted) Completely
Special tools required:
IMPORTANT:
Replacement of the sunk nut on the rear axle final drive is absolutely required.
The sunk nut already has a screw locking.
After the propeller shaft has been screwed into the rear axle final drive (sunk nut), a hardening time of at least 2 hours is absolutely necessary.
The hardening time may be extended at lower temperatures.
Failure to comply with these instructions may cause serious damage.
IMPORTANT:
- With four-wheel drive and on renewal only:
according to installation with BMW diagnosis and information system under control unit function
Perform function check of transfer box (calibration)
Necessary preliminary tasks:
- Remove complete exhaust system
- Remove underbody protection with holders
- Remove heat shields
IMPORTANT:
To avoid buzzing sound after refitting the propeller shaft:
1. The flexible disc connection (1) on the front at the propeller shaft must be marked in one plane with the flexible disc (2) and the three-bolt flange (3) before removal.
2. During installation the three-bolt flange (3) must be forced back together again with the flexible disc (2) in the same position.
Release screws.
Installation note:
- Replace ZNS bolts and self-locking nuts.
- Grip mounting bolts of flexible disc at nuts and tighten down by way of bolts.
Installation note:
Check centring mount.
If necessary, replace damaged centring.
Grease centring mount.
- Grease: BMW Service Operating Fluids.
Installation note:
Tighten down screws/bolts to specified torque.
Secure angle of rotation special tool 00 9 120 with magnets 00 9 130 to vehicle underbody and screw down further according to angle of rotation.
Tightening torque 26 11 1AZ.
Slacken screws (1) Tightening torque 26 11 6AZ.
Using a suitable tool (2), secure propeller shaft at centre universal joint against turning.
Remove screws of centre mount fully only after opening insert nut.
IMPORTANT: The centre mount of the propeller shaft in E9x M3 can be installed in two directions. The "TOP" label on the centre mount must be face the body.
Release insert nut against direction of travel in clockwise direction with special tools 33 5 040 and 33 5 070.
Tightening torque 26 11 1AZ.
IMPORTANT:
The bi-hexagonal flange nut must not be used for bracing.
Failure to comply with this instruction may result in serious damage to the rear axle final drive.
Remove retaining clip (1) and gasket (2).
Installation note:
Retaining clip and gasket must be replaced.
Remove insert nut (1).
Installation note:
Insert nut must be replaced.
Before installing propeller shaft:
Clean insert collar (1) on flange nut and gearing on bevel pinion (2).
Fill insert collar (1) with grease.
Grease: BMW Service Operating Fluids.
Clean thread (1) of joint hub to remove adhesive residues.
Clean hub teeth (2), then coat with grease.
Grease: BMW Service Operating Fluids.
IMPORTANT: Thread of joint hub must not be fouled with grease.
Place flange nut (1) with gasket in insert collar of flange nut.
Install retaining clip (2).
IMPORTANT:
Adhere without fail to installation and screw-fastening sequence.
Installation sequence:
1. Join output shaft to transmission
2. Join output shaft to rear axle final drive
3. Join centre mount
Screw-fastening sequence:
1. Insert nut
2. Flexible disc to transmission
3. Centre mount
Slide propeller shaft (1) to the limit position onto insert nut and secure.
Secure propeller shaft at centre universal joint against turning with a mounting lever.
IMPORTANT:
The bi-hexagonal flange nut (2) must not be used for bracing.
Failure to comply with this instruction may result in serious damage to the rear axle final drive.
Insert nut must be screwed into place within 5 minutes.
Tightening torque 26 11 1AZ.