FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Turbocharger Overview






Turbocharger Overview

Secure all hose connections using hose clamps appropriate for the model type.

Hose connections and charge air system hoses must be free of oil and grease before installing. On connector couplings, the seal and sealing surfaces must only be lightly oiled. Refer to => [ Air Ducts with Connector Couplings ] Air Ducts with Connector Couplings.

Charge air system must be properly sealed.

Replace the self-locking nuts.

Hose clip pliers (VAS 6362) or hose clip pliers (V.A.G 1921) are recommended for installing spring clamps.

Add oil to turbocharger through oil feed line connecting piece.

After installing turbocharger, let engine idle for approximately 1 minute without increasing engine speed. This ensures adequate oil supply to the turbocharger.

Observe the rules for cleanliness, refer to => [ Clean Working Conditions ] Clean Working Conditions.

Part I

Part II

Part III






1 Turbocharger

Can only be replaced with exhaust manifold and pressure unit.

Removing and installing, refer to => [ Turbocharger ] Turbocharger

2 Hose

3 Turbocharger Vacuum Diaphragm

Can be replaced only with the turbocharger

4 Hose Clamp

5 Hose

6 Hose

7 Bolt

3 Nm

8 Wastegate Bypass Regulator Valve (N75)

9 Hose

10 Turbocharger Recirculating Valve (N249)

Note installation position => [ Installed Position ]

11 Bolt

7 Nm

12 O-ring

Replace

13 O-ring

Replace

14 Connection

15 Bolt

9 Nm

Installed Position Turbocharger Recirculating Valve (N249)





- Note installed location - arrows -.

Part II

Part I

Part III






1 Turbocharger

Can only be replaced with exhaust manifold and pressure unit.

Removing and installing, refer to => [ Turbocharger ] Turbocharger

2 Bolt

9 Nm

3 Crankcase Ventilation Pipe

4 Gasket

Replace

5 Seal

Replace

6 Bolt

30 Nm

7 Oil Supply Line

8 Bolt

9 Nm

9 Bolt

9 Nm

10 O-ring

Replace

11 Seal

Replace

12 Bolt

35 Nm

13 Bolt

9 Nm

14 Bolt

35 Nm

15 Seal

Replace

16 Coolant Supply Line

17 Bolt

9 Nm

18 Bolt

9 Nm

19 Gasket

Replace

20 Oil Return Pipe

21 Gasket

Replace

Part III

Part I

Part II






1 Gasket

Replace

2 Nut

Replace

Tightening order => [ Turbocharger Tightening Sequence ]

Coat the exhaust manifold stud bolts with hot bolt past; hot bolt paste, refer to the electronic parts catalog ETKA.

3 Bolt

35 Nm

4 Seal

Replace

5 Coolant Return Line

6 Bolt

9 Nm

7 Turbocharger

Can only be replaced with exhaust manifold and pressure unit.

Removing and installing, refer to => [ Turbocharger ] Turbocharger

8 Bolt

30 Nm

9 Bracket

10 Brace

11 Bolt

30 Nm

12 Bolt

30 Nm

Coat the bolt with hot bolt paste; hot bolt paste, refer to the electronic parts catalog ETKA.

13 Nut

Replace

30 Nm

Do not open when removing turbocharger

Coat the exhaust manifold stud bolts with hot bolt past; hot bolt paste, refer to the electronic parts catalog ETKA.

14 Fastening Strip

Turbocharger Tightening Sequence





- Tighten the bolts - 1 through 5 - in 4 stages as follows:

- Tighten the bolts to 5 Nm.

- Tighten the bolts to 12 Nm.

- Tighten the bolts to 16 Nm.

- Tighten the bolts to 25 Nm.