Programming and Relearning
Voltage Supply Interruption
• After reconnecting the voltage supply the following operations must be performed:
- Check DTC memory and erase, if necessary. Refer to => [ DTC Memory, Erasing ] DTC Memory, Erasing.
- Generate readiness code if the DTC memory has been erased. Refer to => [ Readiness Code, Generating ] Readiness Code, Generating.