Refrigerant Pipe For the Expansion Valve to Junction Block
Operation number: 87465-2
Refrigerant pipe for the expansion valve to junction block
Note! Some variation in the illustrations may occur, but the essential information is always correct.
Removal
Note! Removal steps in this procedure may contain installation details.
Drain the refrigerant from the AC system Refer to: Refrigerant, draining Refrigerant, Draining.
Remove the upper torque rod Refer to: Upper torque rod, B6324S5 Upper Torque Rod.
Torque: M8, 24 Nm
Torque: M6, 10 Nm
For vehicles with rear AC
Torque: M6, 10 Nm
Installation
To install, reverse the removal procedure
Vacuum pump the AC system. Refer to: Vacuum pumping Vacuum Pumping.
Fill the AC-system with refrigerant. Refer to: Refrigerant, filling Refrigerant, Filling.
Leak-trace the air conditioning system. Refer to: Leak tracing, fluorescent tracing agent / UV lamp Leak Tracing, Fluorescent Tracing Agent/UV Lamp.
Carry out a performance test on the climate control system. Refer to: Climate system, performance test Climate System, Performance Test.