Thermostatic Expansion Valve to Connector Block Line
Operation number: 87457-2
Thermostatic Expansion Valve to Connector Block Line
Removal
Note! Removal steps in this procedure may contain installation details.
Drain the refrigerant Refer to: Refrigerant, draining Refrigerant, Draining
Remove the wiper arm Refer to: Wiper arm Service and Repair
Remove the plenum cover Refer to: Plenum chamber Service and Repair
Remove contact breaker high pressure Refer to: Switch high pressure, B6324S5, B6304T4, B6324S4 Switch High Pressure
Detach the following items:
1. Torque: M5, 5 Nm
2. Torque: M8, 24 Nm
Torque: M6, 10 Nm
Installation
To install, reverse the removal procedure.
Perform vacuum-pumping Refer to: Vacuum pumping Vacuum Pumping
Perform refrigerant, filling Refer to: Refrigerant, filling Refrigerant, Filling
Carry out leakage detection with tracing agent Refer to: Leak detection, tracer agent Leak Detection, Tracer Agent
Perform climate unit, checking Refer to: Climate control system, check Climate Control System, Check