FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Bulkhead Assembly Overview







Bulkhead Assembly Overview

The bulkhead - 1 - is bolted and also bonded in with PUR adhesive sealing material - 3 -.






1 Bulkhead

Removing:

- After unscrewing of bolts - 2 -, cut through adhesive bead using workshop tools.

2 Bolt

Quantity: 10

Tightening specification: 25 Nm

3 PUR adhesive sealant

DH 009 100 03

Bead diameter: - Height a - = 10 mm, - Width b - = 8 mm

Minimum curing time => [ Minimum Curing Time ] Minimum Curing Time