FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Roof Edge Spoiler Installation Information







Roof Edge Spoiler Installation Information

The surfaces of the components to be primed must be free of dirt.

- Remove adhesive residue using (D 002 000 10).

- Saturate a cloth with (LSE 020 100 A3).

- Always wipe application area for adhesive bead twice using saturated cloth and allow to air dry.

- Now apply glass/primer uniformly in one stroke using (D 009 500 25).

Drying time is approximately 10 minutes

- Adhesive material must be applied to the primed surfaces of the component.


Components must be installed within 10 minutes, otherwise bonding properties of adhesive will be impaired.

Keep gap dimensions as narrow as possible, approximately 1 mm.

Secure components using adhesive tape during the minimum curing time.