FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Seals with Sipiol Coating, Repairing







Seals with Sipiol Coating, Repairing

General Information

Sipiol is a lubricating varnish.

Damage to the Sipiol coating is easy to recognize.

The Sipiol coating is rough and dull.

The seal below it is smooth and shiny.

Damage






1 Seal

Only the seals listed in the overview may be repaired.

2 Sipiol coating

3 Sipiol coating wearing off

4 Raised Sipiol coating

5 Sipiol coating rubbed off

6 Torn Sipiol coating

Coated Seals Overview






1 Windshield wiper seal

2 Door pillar seal

3 Roof center section seal

4 Rear window frame seal

Only the side portions may be coated

5 Side window seal

6 Front window guide seal

Repair Kit G 052 523 A2

The repair kit (G 052 523 A2) contains the following materials:

Sipiol varnish

Curing agent

Spatula

Applicator

Primer

Lint-free cloths

Repair Description

Repairing the Sipiol coating is like painting.

Cleaning and maintaining clean working conditions is very important.

Repairs are made with the repair kit (G 052 523 A2).

The vehicle is clean and dry.

- Tape off the components adjacent to the seal that will be repaired.

- Completely remove any loose Sipiol coating.

- Sand the unattached and attached seals in a 1 cm radius using 120 grit sandpaper.

- Roughen the rest of the coating up to the edges of the seal or to a vulcanized seam with 240 grit sandpaper.

- Clean the seal thoroughly with silicone remover (LSE 020 100 A3) and the lint-free cloth.

Always allow a curing time of 15 minutes at a minimum temperature of 60 °F (15° C).

- Soak the lint-free cloth with primer and apply the primer in one wiping motion. Then wipe the area immediately with a dry side of the cloth in one wiping motion. Only an extremely thin film of primer should remain on the seal.

Always allow a curing time of 5 minutes at a minimum temperature of 60 °F (15° C).

- Mix the curing agent and Sipiol well with the spatula.

- Dab the Sipiol on the seal evenly with the applicator. Air bubbles must not form under the Sipiol.

Always allow a minimum curing time of 8 hours at a minimum temperature of 60 °F (15° C).

After the lubricating varnish cures, treat the new coating with the special rubber care set (000 096 331).