Turbocharger
Turbocharger
• Secure all hose connections using hose clamps appropriate for the model type.
• Hose connections and charge air system hoses must be free of oil and grease before installing. On connector couplings, the seal and sealing surfaces must only be lightly oiled. Refer to => [ Charge Air Hose, Installing ] Charge Air Hose, Installing.
• Charge air system must be properly sealed.
• Replace the self-locking nuts.
• Hose clip pliers (VAS 6362) or hose clip pliers (V.A.G 1921) are recommended for installing spring clamps.
• Add oil to the turbocharger through the oil supply pipe connecting piece.
• After installing the turbocharger, let the engine idle for approximately 1 minute without increasing the engine speed. This ensures adequate oil supply to the turbocharger.
• Observe the rules for cleanliness. Refer to => [ Clean Working Conditions ] Fuel Supply.