FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Secondary Air Injection Pump Motor, Checking






Diagnostic Procedures

Secondary Air Injection Pump Motor, Checking

Special tools, testers and auxiliary items required

Multimeter.

Wiring diagram.

Test requirements

The Secondary Air Injection (AIR) Pump Relay (-J299- ) fuse 27 in Fuse Box B is OK.

The Motronic Engine Control Module (ECM) Power Supply Relay (J271) fuse OK.

Battery voltage at least 12.5 V.

All electrical consumers switched off (radiator fan must NOT run during test).

A/C switched off.

The ignition switched off.

Test procedure

- Perform a preliminary check to verify the customers complaint. Refer to => [ Preliminary Check ] Preliminary Check.

Start diagnosis

- Disconnect the secondary air injection hose.

- Disconnect the Secondary Air Injection (AIR) Pump Motor (-V101-) electrical harness connector.





Checking voltage

- Start the engine.

- Using a multimeter, check the Secondary Air Injection (AIR) Pump Motor (-V101-) electrical harness connector terminals 1 to 2 for voltage.





Specified value: battery voltage.

- Switch the ignition off.

If the specified value was Not obtained:

- Switch the ignition on

- Using a multimeter, check the Secondary Air Injection (AIR) Pump Motor (-V101-) electrical harness connector terminal 2 to Ground (GND).

Specified value: battery voltage.

If the specified value was Not obtained:

- Check the wiring connection from the Secondary Air Injection (AIR) Pump Relay (-J299-) socket 2 (relay terminal 87) to the Secondary Air Injection (AIR) Pump Motor (-V101- ) electrical harness connector terminal 2 for an open circuit or a short circuit.

- Check the wiring connections for damage, corrosion, loose or broken terminals or an open fuse. Refer to the wiring diagram.

- If necessary, repair the faulty wiring connection, replace fuse if needed.

If the wiring has no fault, the fuse is not open and voltage is Not present:

Replace the Secondary Air Injection (AIR) Pump Relay (-J299-)

If the specified value was obtained:

Checking Ground (GND)

- Using a multimeter, check the Secondary Air Injection (AIR) Pump Motor (-V101-) electrical harness connector terminal 1 to Ground (GND) for resistance.





Specified value: 1.5 ohms Max.

If the specified value was Not obtained:

- Check the wiring for an open or high resistance.

- Check the electrical harness connector for damage, corrosion, loose or broken terminals.

- If necessary, repair the faulty wiring connection.

If no malfunction is found in the wiring and voltage supply was OK:

- Replace Secondary Air Injection (AIR) Pump Motor (-V101-).

- Erase the DTC memory. Refer to => [ Diagnostic Mode 04 - Erase DTC Memory ] Scan Tool Testing and Procedures.

- Perform a road test to verify repair.

Final procedures

After the repair work, the work steps below must be performed in the following sequence:

1. Check the DTC memory. Refer to => [ Diagnostic Mode 03 - Read DTC Memory ] Scan Tool Testing and Procedures.

2. If necessary, erase the DTC memory. Refer to => [ Diagnostic Mode 04 - Erase DTC Memory ] Scan Tool Testing and Procedures.

3. If the DTC memory was erased, generate readiness code. Refer to => [ Readiness Code ] Monitors, Trips, Drive Cycles and Readiness Codes.