Convertible Top Moulding / Trim: Service and Repair
New Roof Pillar Trim, Preparing
NOTE: The tensioning bands are packaged with the original component. The tensioning bands must be adapted.
- Guide the tensioning bands - 1 and 2- through the eyes on the trim - 1 -.
- The tensioning band - 1 - has a white marking and is cut off there - arrow a -.
- Position the seal - 4 - 15 mm - dimension c - from the end of the tensioning bands.