With Manufacturer's Scan Tool
Charge pressure bypass valve, checking
Special tools and equipment
- VAG 1390 Hand vacuum pump
Test conditions
- Reduced performance or load change shudders
- Turbocharging noises during closing of throttle valve
Test sequence
Note: The charge pressure bypass valve is located in front of the turbocharger. It is opened by vacuum pressure during the overrun phase and at idling speed.
- Connect hand vacuum pump VAG 1390 to vacuum connection on charge pressure bypass valve.
- Operate hand vacuum pump.
Charge pressure bypass valve must open in direction of -arrow-.
- Operate vent valve on hand vacuum pump.
Valve must close -arrow-.
- If valve does not open or close, replace valve.
Note: The charge pressure bypass valve connections are secured with screw type clamps.