With Manufacturer's Scan Tool
Overrun Shut-off Valve, Checking
Special tools and equipment
- VAG 1390 Hand vacuum pump
Test conditions
- Reduced performance or load change shudders
Test sequence
NOTE: The overrun shut-off valve is located in front of the turbocharger. It is opened by vacuum pressure during the overrun phase and at idling speed.
- Connect hand vacuum pump VAG 1390 to vacuum connection on overrun valve.
- Operate hand vacuum pump.
Overrun valve must open in direction of -arrow-.
- Operate vent valve on hand vacuum pump.
Overrun valve must close.
- If overrun valve does not open or close, replace valve.
NOTE: The overrun shut-off valve connections are secured with screw-type clips.