Installation (from 07/2011)
1NZ-FE ENGINE MECHANICAL: FRONT CRANKSHAFT OIL SEAL (for Hatchback): INSTALLATION
1. INSTALL OIL PUMP SEAL
(a) Apply MP grease to the lip of a new oil pump seal.
NOTICE:
Keep the lip free of foreign matter.
(b) Using SST and a hammer, tap in the timing chain cover oil seal until its surface is flush with the timing chain cover edge.
SST : 09223-22010
NOTICE:
* Do not tap the oil seal at an angle.
* Wipe off extra grease from the crankshaft.
HINT
Oil seal tap in depth:
0 to 1.0 mm (0 to -0.04 in.)
2. INSTALL CRANKSHAFT DAMPER SUB-ASSEMBLY Installation (from 07/2011)
3. INSTALL ENGINE MOUNTING INSULATOR SUB-ASSEMBLY RH Installation (from 07/2011)
4. INSTALL FAN AND GENERATOR V BELT Installation (from 07/2011)
5. ADJUST FAN AND GENERATOR V BELT Installation (from 07/2011)
6. INSPECT FAN AND GENERATOR V BELT Testing and Inspection
7. INSPECT FOR ENGINE OIL LEAK
8. INSTALL ENGINE UNDER COVER RH
9. INSTALL FRONT WHEEL RH
Torque : 103 Nm (1050 kgf-cm, 76 ft-lbf)