Installation
EB62 MANUAL TRANSAXLE: BACK-UP LIGHT SWITCH: INSTALLATION
1. INSTALL BACK-UP LIGHT SWITCH ASSEMBLY
(a) Using SST, install the back-up light switch with a new gasket to the transaxle case.
SST : 09817-16011
Torque : 40 Nm (410 kgf-cm, 30 ft-lbf)
(b) Connect the back-up light switch connector.
2. INSTALL INLET AIR CLEANER ASSEMBLY
(a) Install the inlet air cleaner assembly with the 2 bolts.
Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)