FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation (from 12/2010)





2GR-FE ENGINE CONTROL SYSTEM: THROTTLE BODY: INSTALLATION

1. INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY

(a) Install a new throttle body gasket to the intake air surge tank.





(b) Install the throttle w/ motor body assembly and wire harness clamp stay to the intake air surge tank with the 4 bolts.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

(c) Connect the throttle w/ motor body assembly connector.

2. CONNECT WATER BY-PASS HOSE

(a) Connect the 2 water by-pass hoses to the throttle w/ motor body assembly.





3. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE Installation (from 12/2010)

4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.

5. ADD ENGINE COOLANT Service and Repair

6. INSPECT FOR COOLANT LEAK Service and Repair

7. INSTALL V-BANK COVER SUB-ASSEMBLY Installation (from 12/2010)

8. CHECK FUNCTION OF THROTTLE BODY On-Vehicle Inspection