Entire Combination Meter Does Not Operate
METER: METER / GAUGE SYSTEM: Entire Combination Meter does not Operate
- Entire Combination Meter does not Operate
WIRING DIAGRAM
INSPECTION PROCEDURE
PROCEDURE
1. CHECK HARNESS AND CONNECTOR (COMBINATION METER ASSEMBLY CIRCUIT)
(a) Disconnect the E30 connector.
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
(c) Measure the voltage according to the value(s) in the table below.
Standard Voltage:
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- REPLACE COMBINATION METER ASSEMBLY