Installation (from 12/2010)
METER: COMBINATION METER: INSTALLATION
1. INSTALL COMBINATION METER ASSEMBLY
(a) Connect the connector.
(b) Install the combination meter assembly with the 4 screws.
2. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY Installation (from 12/2010)
3. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY Installation (from 12/2010)
4. INSTALL INSTRUMENT PANEL FINISH PLATE (w/o Smart Key System) Installation (from 12/2010)
5. INSTALL CENTER UPPER INSTRUMENT CLUSTER FINISH PANEL Installation (from 12/2010)
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.