FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation








2AZ-FE EMISSION CONTROL: PURGE VALVE: INSTALLATION

INSTALLATION

1. INSTALL VACUUM SWITCHING VALVE





(a) Install the vacuum switching valve onto the air cleaner hose.
(b) Connect the 2 purge line hoses to the vacuum switching valve. (A)
(c) Connect the wire harness clamp. (B)
(d) Connect the vacuum switching valve connector. (C)