Installation
C59 MANUAL TRANSAXLE: SHIFT LEVER ASSEMBLY:
COMPONENTS
INSTALLATION
1. INSTALL FLOOR SHIFT LEVER ASSEMBLY
(a) Install the shift lever assembly with the 4 nuts.
Torque: 12 Nm (120 kgf-cm, 9 ft-lbf)
2. CONNECT FLOOR SHIFT CABLE TRANSMISSION CONTROL SELECT
(a) Connect the select cable to the shift lever assembly.
- The projecting part of the cable outer should face upward when the shift cable is installed.
- Make sure that after installation the cable outer spring is moved to the place shown in the illustration.
(b) Connect the select cable end with the clip to the shift lever assembly.
(c) Connect the select cable to the clamp.
3. CONNECT FLOOR SHIFT CABLE TRANSMISSION CONTROL SHIFT
(a) Connect the shift cable with the clip to the shift lever assembly.
- The projecting part of the cable outer should face upward when the shift cable is installed.
- Make sure that after installation the cable outer spring is moved to the place shown in the illustration.
(b) Connect the shift cable end as shown in the illustration.
(c) Install the washer and clip.
(d) Connect the shift cable to the clamp.
4. INSTALL INSTRUMENT PANEL FINISH PANEL LOWER CENTER (Installation)
5. INSTALL INSTRUMENT PANEL BOX (Installation)
6. INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY CTR (Installation)
7. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY