FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Canister Purge Solenoid: Testing and Inspection








1ZZ-FE EMISSION CONTROL: PURGE VALVE:

INSPECTION

1. INSPECT VACUUM SWITCHING VALVE ASSEMBLY NO. 1





(a) Check the resistance.
(1) Using an ohmmeter, measure the resistance between the terminals.
Resistance:





If the resistance is not as specified, replace the vacuum switching valve No. 1.





(b) Check the vacuum switching valve No. 1 for ground.
(1) Using an ohmmeter, check the resistance between each terminal and the body.
Resistance:





If the resistance is not as specified, replace the vacuum switching valve No. 1.
(c) Check the operation.





(1) Check that air does not flow from port E to F.
If the operation is not as specified, replace the vacuum switching valve No. 1.





(2) Apply battery voltage across the terminals.
(3) Check that air flows from port E to port F.
If the operation is not as specified, replace the vacuum switching valve No. 1.