FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Relay "C"

Relay "C" Testing:






CONTINUITY

1. Check that there is continuity between terminals 5 and 6.
2. Check that there is no continuity between terminals 1 and 3.
3. If continuity is not as specified, replace relay.

OPERATION

1. Apply battery voltage across terminals 5 and 6.
2. Check that there is continuity between terminals 1 and 3.
3. If operation is not as specified, replace relay.