Relay "B"
Relay "B" Testing:
CONTINUITY
1. Check that there is continuity between terminals 5 and 8.
2. Check that there is no continuity between terminals 2 and 3.
3. If continuity is not as specified, replace relay.
OPERATION
1. Apply battery voltage across terminals 5 and 8.
2. Check that there is continuity between terminals 2 and 3.
3. If operation is not as specified, replace relay.