Relay "A"
Relay "A" Testing:
CONTINUITY
1. Check that there is continuity between terminals 5 and 7.
2. Check that there is no continuity between terminals 3 and 4.
3. If continuity is not as specified, replace relay.
OPERATION
1. Apply battery voltage across terminals 5 and 7.
2. Check that there is continuity between terminals 3 and 4.
3. If operation is not as specified, replace relay.