Removal and Installation
Starter (Part 2):
REMOVAL
REMOVE STARTER
a. Disconnect the starter connector.
b. Remove the nut, and disconnect the starter wire.
Torque: 8.8 N.m (90 kgf.cm, 78 in.lbf)
c. Remove the 2 bolts and starter.
Torque: 39 N.m (400 kgf.cm, 29 ft.lbf)
INSTALLATION
Installation is in the reverse order of removal.