FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Power Window Circuit Breaker: Testing and Inspection

INSPECT CIRCUIT BREAKER OPERATION




a. Disconnect the connector from the master switch.
b. Connect the positive (+) lead from the battery to terminal 3 and the negative (-) lead to terminal 4 on the wire harness side connector, and raise the window to full closed position.
c. Continue to apply voltage and check that there is a circuit breaker operation noise within approximately 4 - 40 seconds.




d. Reverse the polarity and check that the window begins to descend within approximately 60 seconds.
If operation is not as specified, replace the motor