Removal And Installation
COMPONENTS
REMOVAL
1. DISCHARGE REFRIGERANT FROM REFRIGERATION SYSTEM
HINT: At the time of installation, please refer to the following item.
Evacuate air from refrigeration system.
Charge system with refrigerant and inspect for leakage of refrigerant.
Specified amount: 600 ± 50 g (21.16 ± 1.76 oz.)
2. DISCONNECT SUCTION TUBE AND LIQUID TUBE FROM COOLING UNIT FITTINGS
Torque:
Liquid tube: 14 Nm (140 kg.cm, 10 ft.lb)
Suction tube: 32 Nm (330 kg.cm, 24 ft.lb)
NOTE: Cap the open fittings immediately to keep moisture or dirt out of the system.
HINT: At the time of installation, please refer to the following item.
Lubricate 2 new O-rings with compressor oil and install the tubes.
3. REMOVE 2 GROMMETS
4. REMOVE DRAIN PIPE GROMMET
5. REMOVE THESE PARTS:
a. Glove compartment door
b. Glove compartment door reinforcement
c. Lower No.2 finish panel
d. No.4 heater to register duct
6. REMOVE COOLING UNIT
a. Disconnect the connectors.
b. Remove the 3 screws, bolt and the cooling unit.
INSTALLATION
Installation is in the reverse order of removal