| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace | 12.7 | 9.2 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
| NOTE |
| With AC, Add | 0.2 | 0.1 | A | |
| To R&R Main Bearings, Add |
| With Prerunner | 6.6 | 0.0 | A | |
| To R&R Crankshaft, Add |
| With Prerunner | 6.6 | 0.0 | A | |
| To R&R Oil Pump, Add |
| With Prerunner | 4.1 | 0.0 | A | |
| To Clean Oil Pump Screen, Add | 0.2 | 0.0 | A | |
| To R&R Piston, Pin or Connecting Rod, Add |
| One | 0.2 | 0.0 | A | |
| Each Additional | 0.1 | 0.0 | A | |
| All | 0.5 | 0.0 | A | |
| To R&R Connecting Rod Bearings, Add | 0.7 | 0.4 | A | |
| To R&R Timing Chain, Add |
| No.1 | 4.5 | 0.0 | A | |
| No.2 | 4.7 | 0.0 | A | |
| To R&R Valves and/or Bushings, Add | 11.2 | 8.0 | A | |