FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

6MT

INSTALLATION

PITCHING STOPPER

1) Install the pitching stopper.

Tightening torque:
T1: 50 Nm (5.1 kgf-m, 36.9 ft-lb)
T2: 58 Nm (5.9 kgf-m, 42.8 ft-lb)





2) Install the intercooler.
3) Connect the ground cable to battery.

CROSSMEMBER AND CUSHION RUBBER

1) Install the transmission cushion rubber.

Tightening torque:
35 Nm (3.6 kgf-m, 25.8 ft-lb)

2) Install the crossmember.

Tightening torque:
T1: 35 Nm (3.6 kgf-m, 25.8 ft-lb)
T2: 70 Nm (7.1 kgf-m, 51.6 ft-lb)
T3: 140 Nm (14.3 kgf-m, 103 ft-lb)





3) Remove the transmission jack.
4) Install the heat shield cover.
5) Install the rear exhaust pipe and muffler.
6) Install the center exhaust pipe.