Canister Purge Solenoid: Testing and Inspection
Purge Control Solenoid ValveINSPECTION
1. PURGE CONTROL SOLENOID VALVE
1. Check that the purge control solenoid valve has no deformation, cracks or other damages.
2. Measure the resistance between the purge control solenoid valve terminals.
3. Check that air does not come out from (B) when air is blown into (A).
4. Connect the battery positive terminal to the terminal No. 1 and the battery negative terminal to the terminal No. 2. Check that air is discharged from (B), when supplying air to (A).
2. OTHER INSPECTIONS
Check that the evaporation hose has no cracks, damage or loose part.