Removal and Installation
GeneratorREMOVAL
1. Disconnect the ground cable from battery.
2. Disconnect the connector and terminal from generator.
- 2.5L Non-turbo model (U5)
- 2.5L Non-turbo model (Except for U5)
- 3.0L Non-turbo model
- Turbo model
3. Remove the V-belt covers.
4. Remove the V-belts.
5. Remove the bolts which install the generator onto bracket.
INSTALLATION
Install in the reverse order of removal.
Tightening torque: 25 N.m (2.5 kgf.m, 18.1 ft.lb)
CAUTION: Check and adjust the V-belt tension.