Starter Solenoid: Testing and Inspection
INSPECTIONMAGNETIC SWITCH
CAUTION:
- The following magnetic switch tests should be performed with specified voltage applied.
- Each test should be conducted within 3 to 5 seconds. Power to be furnished should be one-half the rated voltage.