Evaporative Emission Control Canister: Service and Repair
1. Lift-up the vehicle.2. Loosen two clamps which hold two canister hoses.
3. Disconnect evaporation three hoses from canister.
4. Remove canister from body.
5. Installation is in the reverse order of removal.
Tightening torque:
22.5 ± 7 Nm (2.3 ± 0.7 kg.m, 16.6 ± 5.1 ft.lb)