FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One Cyl7.35.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigauge Bearings.
All Cyls8.86.6AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigauge Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew3.30.0A
Crankshaft, Renew3.30.0A
Timing Belt, Renew0.50.0A
Tune-Up0.30.0A