Evaporative Emission Control Canister: Testing and Inspection
FA20 EMISSION CONTROL: CANISTER: INSPECTION; 2013 MY FR-S [03/2012 -]
1. INSPECT CHARCOAL CANISTER ASSEMBLY
NOTICE:
When applying vacuum, the needle may waver but, as long as the needle returns to its initial position immediately, it is not a malfunction.
(a) Visually check the charcoal canister assembly for cracks or damage.
If cracks or damage is found, replace the charcoal canister assembly.
(b) Check the air flow.
(1) Using a vacuum pump, check the air flow according to the procedures below.
OK:
If the result is not as specified, replace the charcoal canister assembly.
2. INSPECT CANISTER PUMP MODULE
(a) Measure the resistance according to the value in the table below.
Standard Resistance:
(b) Check the operation of the check valve.
(1) Install a clean hose to the purge valve.
(2) Check that air flows from port A to port B.
(3) Connect the positive (+) lead of the battery to terminal 5 and the negative (-) lead to terminal 1.
(4) Check that air does not flow from port A to port B.
(5) Connect the positive (+) lead of the battery to terminal 3 and the negative (-) lead to terminal 4.
(6) Check that the vacuum pump operates.
NOTICE:
Do not operate vacuum pump for 5 minutes or more.
(7) Connect the positive (+) lead of the battery to terminal 6 and the negative (-) lead to terminal 8.
(8) Measure the voltage according to the value in the table below.
Standard Voltage:
(9) Connect the positive (+) lead of the battery to terminal 6 and the negative (-) lead to terminal 8.
(10) Connect the positive (+) lead of the battery to terminal 3 and the negative (-) lead to terminal 4. Check that the voltage drops slightly from 3.5 volts.