Installation
2ZR-FE ENGINE CONTROL SYSTEM: KNOCK SENSOR: INSTALLATION
1. INSTALL KNOCK SENSOR
(a) Install the knock sensor with the bolt as shown in the illustration.
Torque : 21 Nm (214 kgf-cm, 16 ft-lbf)
(b) Connect the knock sensor connector.
2. INSTALL INTAKE MANIFOLD
(a) Install a new gasket onto the intake manifold.
(b) Install the intake manifold and intake manifold stay with the 4 bolts and 2 nuts.
Torque : 28 Nm (286 kgf-cm, 21 ft-lbf)
(c) Connect the water by-pass hose and the No. 2 water by-pass hose.
(d) Connect the throttle body assembly connector.
(e) Connect the ventilation hose.
(f) Connect the 4 wire harness clamps.
3. INSTALL TRANSMISSION OIL LEVEL GAUGE SUB-ASSEMBLY (for Automatic Transaxle) Installation
4. INSTALL OIL COOLER TUBE (for Automatic Transaxle) Installation
5. INSTALL ENGINE OIL LEVEL DIPSTICK
6. INSTALL STARTER ASSEMBLY Installation
7. INSTALL FLYWHEEL HOUSING SIDE COVER Installation
8. INSTALL INJECTOR VIBRATION INSULATOR Installation
9. INSTALL NO. 1 DELIVERY PIPE SPACER Installation
10. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY Installation
11. CONNECT FUEL TUBE SUB-ASSEMBLY Installation
12. INSTALL FUEL PIPE CLAMP Installation
13. CONNECT VACUUM HOSE Installation
14. CONNECT NO. 1 FUEL VAPOR FEED HOSE Installation
15. INSTALL HARNESS BRACKET Installation
16. INSTALL ENGINE WIRE HARNESS Installation
17. INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH HOSE Installation
18. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)
19. ADD ENGINE COOLANT Service and Repair
20. INSPECT FOR COOLANT LEAK Testing and Inspection
21. INSPECT FOR FUEL LEAK
Fuel System: Precaution
22. INSTALL NO. 2 CYLINDER HEAD COVER Installation
23. INSTALL ENGINE UNDER COVER RH
Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)
24. INSTALL ENGINE UNDER COVER LH
Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)