Installation
U341E AUTOMATIC TRANSAXLE: PARK / NEUTRAL POSITION SWITCH: INSTALLATION
1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
(a) Install the park/neutral position switch assembly onto the manual valve lever shaft.
(b) Provisionally install the 2 bolts.
(c) Replace the lock plate with a new one and tighten the manual valve shaft nut.
Torque : 6.9 Nm (70 kgf-cm, 61 in-lbf)
(d) Provisionally install the control shaft lever.
(e) Turn the lever counterclockwise until it stops, then turn it clockwise 2 notches.
(f) Remove the control shaft lever.
(g) Align the groove with the neutral basic line.
(h) Hold the switch in this position and tighten the 2 bolts.
Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)
(i) Using a screwdriver, stake the nut with the lock plate.
(j) Install the control shaft lever with the nut and washer.
Torque : 13 Nm (129 kgf-cm, 9 ft-lbf)
(k) Connect the connector to the park/neutral position switch assembly.
2. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY
(a) Install the transmission control cable assembly onto the control shaft lever with the nut.
Torque : 12 Nm (122 kgf-cm, 9 ft-lbf)
(b) Fix the transmission control cable assembly onto the control cable bracket with a new clip.
NOTICE:
Make sure that the marking on the cable is aligned with the slit in the transmission control cable bracket before installing the cable.
3. INSPECT SHIFT LEVER POSITION Initial Inspection and Diagnostic Overview
4. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY Initial Inspection and Diagnostic Overview
5. INSTALL ENGINE UNDER COVER LH
Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)